The platform

One plan. Each person sees what they need to decide.

Unbrick plans your plant forward from your ERP’s latest data, optimizes around your constraint, then puts the result in front of each role in the terms that role works in: dollars for the owner, dates and trade-offs for the planner, a queue for the cell lead, the next job for the operator.

01 · The owner

What the plan is worth, in dollars.

The outcomeYou know how much cash is sitting on the floor, why, and which decision frees the most of it.

  • WIP at cost

    Every open lot valued from your labor records, rates and material costs: in work, stalled, finished but not shipped, and by department.

  • Cash you can free

    Ship what is finished, restart or close stalled lots, slow what no order needs yet. Each lever says what it is worth and which lots it touches.

  • WIP ahead, two plans

    Today’s lots week by week under today’s plan and under another. The gap shows the change in WIP, shipments and carrying cost.

  • Where time goes

    Days a lot waits before each operation against the days it is worked, by department and machine, from your own records.

  • An hour at the bottleneck

    What an hour at your constraint earns in throughput, so a late setup or an hour of overtime has a price everyone can see.

  • The week, in one brief

    What changed, the decisions made and pending, and an honest line on how last week’s dates held up.

02 · The planner

An answer you can sign.

The outcomeA customer’s hot list goes from a day of spreadsheets to an approved answer by lunch, with the reason behind every date.

  • Customer Promise Review

    Resolve every row the customer sent, decide each response on its evidence, preview who slips, then hand it to an approver.

  • Order journey

    “Why is this order late?” Every lot behind an order line, the components that feed it, and the one lot that sets the ship date, in plain words.

  • Trade-offs before you commit

    What pulling a list in gains, which lots finish later and whose orders turn late, including other customers’. Urgency never overrides a quality hold.

  • Sequence board

    Rearrange the work at your bottleneck by hand. Work inside the frozen window is locked, because the floor is already on it.

  • Staffing scenarios

    Add people, move them, add a shift or overtime, and see when past due recovers and which orders ship sooner.

  • Two plans, side by side

    Today’s plan beside a scenario or an engine’s proposal, on the same days and the same history. Nothing changes until a planner adopts it.

  • One list each morning

    Ship, restart, review a hold, release, move an ERP date. Anything inside the frozen window is marked.

03 · The cell lead and the floor

The plan, where the work is.

The outcomeEach cell owns its queue and its week, and what one operator learned on a part is there for the next.

  • Cell boards

    The work in front of the cell against its people and machines. Move a job up, hold it or assign it, with a reason; the next plan says whether it was applied.

  • People and skills

    Skill levels proposed from each person’s own labor records and confirmed by a lead. A person running two machines is counted once; expired certificates stop counting.

  • The constraint, with its reason

    Each day, the departments where work waits while they are busy, and what binds each: people, a scarce skill, or machines.

  • The plant, moving

    The last eight weeks replayed from labor records, then the plan carrying every lot forward. A four-week loop runs on a screen by the floor.

  • Station tablets

    The jobs at this machine now and next, notes from the people who ran the part before, and “I’m stuck”, in English or Spanish. Operators tap a name or a badge; no passwords.

Plan engines

Solvers that show their work.

Constraint optimization, with a person in charge. Start with a rule your planners can predict. Add solvers as the plant grows. Every engine plugs into the same plan, and none of them gets the last word.

1

Propose

An engine suggests an order of work, or which cross-trained people to move, and says what it aimed for and what limited it.

2

Rerun the whole plan

The proposal is replayed through the same finite plan as everything else. No solver is taken at its word.

3

Score it

Order lines on time and late, days late, what moved inside the frozen window, and why each lot moved.

4

A planner decides

Adopt it with a reason, on record, or don’t. If a solver ever fails, the plan falls back to the simple rule and says so.

  1. A

    Due date first

    The default. Hot, then expedite, then the earliest need date.

    Rule
  2. B

    Least slack

    A published dispatching rule: what is at stake per day of work, discounted by slack.

    Rule
  3. C

    Bottleneck sequencer

    Orders the work at your top constraint to cut weighted lateness.

    OR-Tools CP-SAT
  4. D

    Crew allocation

    Finds which cross-trained people to move between departments over the coming weeks.

    HiGHS

Open-source solvers (Apache-2.0 and MIT), on ordinary CPUs inside your deployment. Your data goes to no solver service.

Agents and Ask

It watches the plan, so your people don’t have to.

Each agent reads the same plan every screen shows, notices what changed, and decides whether it is worth a person’s time. It never decides anything else.

The rule. The engines compute; the agents explain. No model output sets a date, a quantity or a priority. A person confirms every change.

  • Planner’s morning

    Newly late lines, newly stalled lots, what can ship today, holds and assumptions about to expire.

  • Customer promises

    Approved answers whose ship date now misses the promise, each with a fix the plan confirms, and a drafted weekly reply for an approver.

  • Constraints watch

    The top constraint moving, capacity drifting from what was demonstrated, stalled lots piling up, certificate gaps.

  • Data health

    Refused and late loads, shrinking tables, parts without routings, open lots without operations.

  • Forecast accuracy

    Issued plans against what happened, by department and customer. The agents’ own dated statements are scored the same way.

  • Cell lead’s shift

    Before each shift, for that cell only: what changed, today’s queue, who is out and certificate gaps.

  • Floor notes

    Daily, for the supervisor: open help calls and operators’ notes waiting for review.

  • Proposals

    A restart, a pull-in, a capacity override, a queue change, a customer answer: previewed by rerunning the whole plan, approved in one click, recorded with both names.

  • Ask

    With a model you connect, one conversation over the whole plan. It writes its own queries, does the arithmetic, tests a change on the plan, and shows every step it took.

  • Setup assistant

    Proposes a setting change as a difference with its effect on the plan, and applies it after an administrator confirms.

Every figure opens a record

Lots, labor, routings, orders. Nothing on a picture is there for decoration, and nothing is estimated without saying so.

Drawn and computed inside

No map, chart, font or solver service is called, hosted or on your own server. Agents run with no language model unless you add one.

Measured on your data

The engine backtest replans from your earlier days and compares deliveries, date error and day-to-day churn. We don’t quote demo results as yours.

See it live

A 30-minute demo, on a plant we built.

We don’t publish screenshots; we show you the product running. The demo runs on illustrative data, so you can ask for anything. Then the same thing runs on your data in a 30-day pilot.

  1. WatchThe plant moving: history, then the plan.
  2. Ask whyOne late order, traced to the lot that sets its date.
  3. Try a changeA solver’s proposal, scored on the whole plan.